Home Building Guide

Building a New Home on Marco Island: Permits, Flood Rules and Seawalls


Marco Island has its own building department, strict flood elevation checks during construction and separate rules for seawalls and Gulf-front lots. Here is what to know before you buy a lot or start design.

Why Building on Marco Island Is Different

Marco Island is an incorporated city, so its own Building Services department reviews plans, issues permits and inspects new homes, not Collier County. Almost every lot sits in a mapped flood zone, many back up to saltwater canals or the Gulf, and the city has its own rules for seawalls, rights-of-way, landscaping and utilities. Knowing those steps before you buy a lot or start design saves time and money.

This guide covers the Marco Island-specific steps. For how flood zones work in general, see our guide to flood zones and elevation in Southwest Florida.

What the City Asks For With a New-Home Permit

The City of Marco Island’s single-family new construction application lists what has to be submitted with the plans. The main items are:

ItemWhat it covers
Sealed structural and architectural plansStructural components must be sealed by a Florida certified design professional
Product approvalsWindows and doors must meet 170 mph wind loads, shown on a product approval index sheet
Truss layouts and design loadsIncluding reactions and uplift loads above the thresholds on the form
Electrical, plumbing, mechanical and energy calculationsLoad calculations, riser diagram, fixture locations and current energy calcs
Survey and impervious surface worksheetThe worksheet is how the city reviews stormwater for a single-family lot
Erosion and sediment control planHow the site will be protected during construction
Other agency approvalsSuch as DEP permits or Health Department approval when they apply
Right-of-way permitA separate permit for new homes, except on private roads, with a driveway plan
Demolition permit numberIf a house was previously on the lot

Before the first inspection, a Notice of Commencement must be recorded and posted at the site.

Flood Elevation and Elevation Certificates

If the lot is in a special flood hazard area, the finished floor has to meet the design flood elevation, and the plans must note it on the large-scale section. Materials below the base flood elevation must be flood resistant.

The city also checks elevation during construction, not just at the end:

  • A flood elevation certificate after the lowest floor is in place and before further vertical construction.
  • A spot survey within 10 days after the approved slab inspection, with a spot elevation certificate.
  • A final survey and final elevation certificate before the certificate of occupancy.

The city keeps an online index of existing elevation certificates by street, which is a helpful starting point when you are comparing lots. In its 2016-2017 floodplain report, the city listed a design flood elevation of 9 feet NAVD or 1 foot above base flood elevation, whichever is greater. Requirements can change, so we confirm the current number for each lot with the city and the surveyor before design.

Seawalls, Docks and Gulf-Front Lots

Many Marco Island homes sit on saltwater canals. Seawall and other marine work use separate city applications, and the city has an ordinance (Ordinance 2006-18) governing the construction, repair and alteration of seawalls next to salt water. If the existing seawall needs work, it is usually best to plan it before or alongside the house so the schedules don’t collide.

Lots on the Gulf beach can also fall seaward of the state’s Coastal Construction Control Line (CCCL). Construction seaward of that line generally needs a permit from the Florida Department of Environmental Protection, in addition to city permits.

Landscaping, Utilities and Deed Restrictions

  • Landscaping: the city’s application requires at least one tree per 2,500 square feet of lot area, and the right-of-way and lot must be irrigated and improved before the certificate of occupancy.
  • Water and sewer: utility fees are paid at the Building Department before the meter is ordered from Marco Island Utilities.
  • Deed restrictions: they may apply. The city refers questions to the Marco Island Civic Association at (239) 642-7778.

Permit Fees and Timelines

The city’s 2023 application form lists building permit fees of $0.60 per square foot under roof, $0.25 per square foot each for electrical, plumbing and mechanical, and a plan review fee of 38% of the permit fee, which is due at application and non-refundable. Fees change, so check the current schedule with Building Services.

The city says review typically takes 10 to 15 workdays when the submittal is complete. A permit expires if work doesn’t start and an inspection isn’t requested within 180 days, or if work stops for 180 days without an approved inspection.

Planning a Home on Marco Island

The best Marco Island homes are planned around the lot from the start: flood elevation, seawall condition, views, setbacks, deed restrictions and utility connections all shape the design and the budget. For a broader look at budgets, see what it costs to build in Southwest Florida, or see our custom homes on Marco Island.

This guide is general information based on City of Marco Island and State of Florida sources, not legal or engineering advice. Rules and fees change; confirm current requirements with City of Marco Island Building Services before you buy or design.

Sources

Questions & Answers

Frequently Asked Questions


Who issues building permits on Marco Island?

The City of Marco Island Building Services department reviews plans and issues permits for new homes on the island, not Collier County. You can reach Building Services at 239-389-5059.

How long does permit review take on Marco Island?

The city says a building permit typically takes 10 to 15 workdays to review, depending on workload and whether every required document is submitted. Missing items or corrections add time.

How high does a new home on Marco Island have to be?

It depends on the lot’s flood zone and base flood elevation. The city’s 2016-2017 floodplain management report listed a design flood elevation of 9 feet NAVD or 1 foot above base flood elevation, whichever is greater, for the special flood hazard area. Confirm the current requirement for your lot with the city before design.

Do I need a separate permit for a seawall or dock?

Yes. The city uses separate applications for seawalls and other marine work, and its seawall rules apply to walls next to salt water. Gulf-front lots may also need a state permit if work is seaward of the Coastal Construction Control Line.

Do deed restrictions apply on Marco Island?

They can. The city’s new-home application notes that deed restrictions may apply and refers questions to the Marco Island Civic Association at (239) 642-7778. Check them before you finalize your design.